Skip to Content
Investment Opportunities

Get Access

Register to view additional information and receive other Arizona Opportunity Zone updates.

Contact Form

EVelution Energy LLC

EVelution Energy LLC

Old U.S. Highway 80 at approximately East 48th Avenue South Tacna, AZ Yuma County, 85352
EVelution Energy LLC is a U.S. critical minerals company developing the first commercial-scale, solar-powered cobalt metal and cobalt sulfate processing facility in the United States. Located in Yuma County, Arizona, the facility is designed to supply the U.S. aerospace, defense, electric-vehicle battery and advanced manufacturing sectors. When fully operational, it is expected to supply up to approximately 40% of projected U.S. cobalt demand, helping reduce America’s reliance on Chinese-controlled cobalt processing and strengthen the resilience of domestic critical minerals supply chains.

EVelution Energy has substantially secured most of its planned long-term cobalt hydroxide feedstock requirements from leading non-Chinese feedstock suppliers in the Democratic Republic of Congo, including ERG, Glencore, Trafigura and EGC. The Company has also entered into a binding five-year cobalt metal offtake agreement with Mitsui, valued at approximately US$850 million and covering substantially all of the facility’s planned cobalt metal production, together with non-binding cobalt sulfate letters of intent involving Trafigura, Mitsui, Umicore and LG Energy Solution, for substantially all of the facility's planned cobalt sulfate production.

The project is being developed as a best-in-class green processing facility powered by an integrated 28 MW solar array and battery-storage system. Its design includes approximately 70% process-water recycling, no on-site tailings ponds, enclosed material handling and advanced air-filtration systems.

Construction of EVelution Energy’s 28 MW solar facility commenced in June 2026. Construction of the cobalt processing facility is expected to begin in the fourth quarter of 2027, with the facility expected to become operational by the fourth quarter of 2029. Once operational, the project is expected to generate approximately US$1.2 billion in annual economic activity and support more than 6,200 jobs.
  • Distance to highway entrance: 0.6 miles
  • Distance to airport: 48.2 miles (Yuma International Airport)
  • Residents within a 30 minute drive: 4,286 (within 30 minutes)
  • Type of Opportunity: Operating business
  • Location: Rural
  • Year founded: 2022
  • Capital sought: $110,200,000.00
  • Opportunity Zone designation: Opportunity Zone 2.0
  • Opportunity Zone 2.0 tract number: 04027011202

www.evelutionenergy.com

Contact:

Documents:

Navigators:

Need help navigating government processes for permits, zoning, water hookups, etc.? Our city, county and tribe specific navigators can help.